Why Eai Image

EAI - Helping Corporate Leaders Accelerate India's Decarbonization Journey

Watch More Videos
Project Timelines for Implementing Industrial Waste Heat Recovery Systems in India | India Renewable Energy Consulting – Solar, Biomass, Wind, Cleantech
Select Page

Implementing industrial waste heat recovery (WHR) systems in India involves several phases, each with specific tasks and time requirements. Below is an outline of typical project timelines based on industry practices and case studies.

1. Feasibility Study and Planning (3-6 months)

  • Initial Assessment: Conduct a preliminary assessment to identify potential waste heat sources and evaluate the feasibility of recovery systems.
  • Detailed Analysis: Perform a detailed analysis involving technical and economic feasibility studies. This includes energy audits, process analysis, and cost-benefit analysis.
  • Approval and Budgeting: Secure necessary approvals from management and allocate budget. Engage with stakeholders to ensure alignment.

2. Design and Engineering (6-9 months)

  • System Design: Develop detailed engineering designs for the waste heat recovery system. This includes selecting appropriate technology (e.g., heat exchangers, ORC systems).
  • Procurement Planning: Identify and select suppliers for equipment and materials. This phase involves preparing specifications and requesting bids from vendors.
  • Regulatory Compliance: Ensure designs comply with local regulations and obtain necessary permits and approvals from government bodies.

3. Procurement and Fabrication (4-6 months)

  • Order Placement: Place orders for equipment and materials based on the finalized designs.
  • Fabrication and Inspection: Manufacture the components and conduct quality inspections to ensure compliance with specifications.
  • Logistics and Delivery: Arrange for transportation and delivery of equipment to the project site.

4. Installation and Commissioning (6-12 months)

  • Site Preparation: Prepare the installation site, which may involve civil works, foundation laying, and infrastructure setup.
  • Equipment Installation: Install the waste heat recovery system components, including mechanical, electrical, and control systems.
  • System Integration: Integrate the WHR system with existing industrial processes. This phase includes setting up monitoring and control systems.
  • Testing and Commissioning: Perform thorough testing to ensure the system operates as designed. Commission the system and make necessary adjustments for optimal performance.

5. Operation and Maintenance (Ongoing)

  • Training: Train plant personnel on operating and maintaining the WHR system.
  • Monitoring and Optimization: Continuously monitor system performance and make adjustments to optimize efficiency and performance.
  • Scheduled Maintenance: Implement a maintenance schedule to ensure the long-term reliability and efficiency of the system.

Total Timeline

The total time for implementing an industrial waste heat recovery system typically ranges from 19 to 33 months, depending on the project’s complexity, size, and specific requirements.

Case Study References

  • Thermax: In India, companies like Thermax have extensive experience in executing WHR projects. Their timelines and processes are aligned with the phases outlined above​ (McKinsey & Company)​.
  • Tata Steel and UltraTech Cement: These companies have implemented WHR systems with similar timelines, involving initial feasibility studies, detailed engineering, procurement, installation, and commissioning phases​ (India Science and Technology)​​ (GEA)​.

Conclusion

The implementation of industrial waste heat recovery systems is a structured process involving multiple phases. Each phase requires careful planning and execution to ensure the project is completed within the estimated timeline and achieves the desired energy efficiency and cost savings.



About Narasimhan Santhanam (Narsi)

Narsi, a Director at EAI, Co-founded one of India's first climate tech consulting firm in 2008.

Since then, he has assisted over 250 Indian and International firms, across many climate tech domain Solar, Bio-energy, Green hydrogen, E-Mobility, Green Chemicals.

Narsi works closely with senior and top management corporates and helps then devise strategy and go-to-market plans to benefit from the fast growing Indian Climate tech market.

narsi-img

Copyright © 2024 EAI. All rights reserved.