Why Eai Image

EAI - Helping Corporate Leaders Accelerate India's Decarbonization Journey

Watch More Videos
Team EAI Blog - India Renewable Energy Consulting – Solar, Biomass, Wind, Cleantech
Select Page
Hello from Team EAI

Here are thoughts, insights, perspectives and opinions from the consulting & research team members at EAI (Energy Alternatives India) - a clean-energy and climatetech-focussed management consulting firm. More about us and our services from www.eai.in

We will be glad to hear your feedback on our blog, or about any assistance you may have for the Indian climate tech sector. You can contact us from here

All the best.

Agricultural biomass availability in India for power generation

February 27, 2011 by Team EAI

India is primarily an agricultural nation with an extensive cultivation of different types of crops including cereal, pulses, oilseeds, fibre crops, spices and plantation crops. With the cultivation of these crops, availability of residual biomass after economic harvest makes power generation in a sustainable way. These raw materials are normally...
Read More...

MNRE revises the capital subsidy for off-grid and decentralised solar Applications

February 24, 2011 by Team EAI

The Ministry of New and Renewable Energy(MNRE) has revised the benchmark cost of the solar PV system and the capital subsidy w.e.f 2011. At present(2010-11), the benchmark cost is Rs. 300/Wp(with battery) and Rs. 210/Wp(without battery) for solar PV off-grid and decentralised applications and the subsidy limit is Rs. 90/Wp(with...
Read More...

Renewtech India 2011 Conference – Day 3

February 23, 2011 by Team EAI

This is my final post on the Renewtech India 2011 conference. Click here for details on Day 1 and click here for details of Day 2. The final day of the event had 3 sessions. The  first session was titled “Tidal & Geo-Thermal Energy”. The first speaker was Dr. Ritesh...
Read More...

Renewtech India 2011 Conference – Day 2

February 23, 2011 by Team EAI

The details of the first day of the conference is available here. The second day of the The 3rd International Expo and Summit, Renewtech India 2011 conference started with a speech by Mr. D.C. Bhishikar, Managing Director, Clarke Energy India. The topic was “Application of Gas Generated from Waste Treatment...
Read More...

Renewtech India 2011 Conference – Day 1

February 23, 2011 by Team EAI

The 3rd International Expo and Summit, Renewtech India 2011 took place at the Bombay Exhibition Centre, Mumbai during the period 17-19 February 2011. The Expo had about 30 Exhibitors representing different stakeholders in the industry. There were players from the Solar PV component manufacturers( Yingli, Websol), Solar Thermal component manufacturers(Soltigua),...
Read More...

How to Set up a Captive PV Power Plant

February 19, 2011 by Team EAI

There are seven steps involved in designing a successful captive solar PV installation Scoping of the project Calculating the amount of solar energy available Surveying the site Calculating the amount of energy needed Sizing the solar system Component selection and costing Detailed design As with any project, you need to...
Read More...

Potential for Biomass Power in India

February 14, 2011 by Team EAI

Biomass based power generation is a choice of reality under the geographical regions where a sustainability exists in the flow of biologically raw materials for the production of power and India is one of the most notable universal giants for the production of biomass based power which can be best...
Read More...

How to Set up a Hybrid Solar System

February 6, 2011 by Team EAI

Steps involved in setting up a hybrid system deserve extra attention because of its importance or uniqueness. The key factors to be determined are The load mix between PV and generator, The size and type of generator, and The battery size. The sizing method assumes that a stand-alone PV system...
Read More...

Why Solar for Captive Power?

February 6, 2011 by Team EAI

Increasing demand from industrial consumers, who are suffering from inadequate power supply and high tariff rate charged by State Electricity Boards (SEBs), find captive generation as the best alternative for meeting their demand. As a result, Captive Power Plant (CPP) capacity grew at a CAGR of 5% during the period...
Read More...

5th EAI CLUB MEET- A report

February 3, 2011 by Team EAI

The first EAI Club Meet of 2011 was held last week (31st January). This edition of the meet was quite different from the past Club Meets and had many firsts. The meet for the first time was held at a new place, Integree Projects Limited, Nungambakkam. Integree is one of...
Read More...
1 92 93 94 95 96 190

Copyright © 2024 EAI. All rights reserved.